Bathroom remodeling in Snohomish County, WA

From a dated hall bath to a primary suite you actually want to spend time in, we handle bathroom remodels start to finish. That includes demo, plumbing, tile, vanities, showers and tubs, lighting and ventilation. We pay close attention to waterproofing and moisture control, because in the Pacific Northwest that's what keeps a bathroom looking good for decades instead of a few years.

What a bathroom remodel can include

  • Demo, down to the studs when it's needed
  • Showers, tubs, vanities and plumbing
  • Tile, with waterproofing behind it
  • Lighting and ventilation
  • Permits for plumbing and electrical changes

Built for a wet climate

Most bathroom trouble starts with water getting somewhere it shouldn't. That's why we take waterproofing and ventilation seriously on every bathroom, not just the big ones. And if demo turns up rot or old plumbing, we stop, show you photos and price the fix before we do anything about it.

Cost and timeline

In 2026, most of our bathroom remodels in Snohomish County cost between $15,000 and $50,000 and take about 4 to 6 weeks once work starts. A hall bath that keeps its layout sits at the low end. A primary bath with a tiled walk-in shower, a new layout or moved plumbing sits at the high end. Tile, the shower and whether the plumbing moves make the biggest difference, and your written estimate spells out labor, materials, permits, demo and disposal.

Request a free estimate

See the project on Recent work: Stone Ave new build, Shoreline

Common questions

How much does a bathroom remodel cost in Snohomish County?

In 2026, most of our bathroom remodels cost between $15,000 and $50,000 and take 4 to 6 weeks once work starts. A hall bath that keeps the same layout is at the low end. A primary bath with a tiled walk-in shower or moved plumbing is at the high end. We'll give you a clear number after we see the space.

Can I use my bathroom during the remodel?

Not while it's torn out. Plan on that bathroom being out of service from demo until the new fixtures are working, which is most of the 4 to 6 weeks a typical bathroom remodel takes. If it's your only bathroom, tell us up front and we'll plan the work to keep that stretch as short as we can.

What if you find a problem behind the walls?

Older homes around here sometimes hide rot, old wiring or plumbing that isn't up to code. If we find something, we stop, show you photos, explain your options and price it before doing anything. We recommend keeping 10 to 15 percent of your budget set aside for surprises like this.

Do I need a permit for my remodel?

If you're moving walls, adding or changing plumbing or electrical, building an addition, or putting on most decks, yes. Swapping cabinets or countertops in the same spot usually doesn't need one. Each city, and Snohomish County for unincorporated areas, has its own rules, so we check before we quote.

See all our FAQs

Where we work

We work throughout Snohomish County, including Lynnwood, Edmonds, Mill Creek, Mountlake Terrace, Brier, Everett, Mukilteo, Snohomish, Monroe, Maltby, Clearview, Lake Stevens, Marysville and Arlington, and in nearby Bothell, Kenmore, Lake Forest Park, Woodinville, Kirkland and Redmond.

See our service area

Other services

Ready to talk about your project?

Call or text us at (425) 581-0158, or send us the details and we'll set up a free visit.

Request an estimate
Call (425) 581-0158 Free estimate